One of the first things that needed to be done was to install solar panels for recharging the batteries. I am glad to say that job is now complete. I installed two 340 watt panels on the hard top and a Morningstar MPPT controller. I think this will take care of most of our electrical needs.
 |
Hard top over the aft deck. |
 |
I love it when a job is finished. |
 |
The other day we were anchored near Islamorada and this floating Tiki bar with an outboard passed us. Life is rough in the Keys. |