Work continues on IQ. I just finished replacing the holding tank. The old one only held 15 gallons. The new one is a 40 gallon tank. It fits in the same space as the old one. I have to put a new macerator pump in yet, but one fun project at a time. We are doing some fiberglass work on the flybridge to seal up some leaks and make it stronger. Lots of work to do, but hey, it's better than roofing.
So far we have:
Changed the oil in the main engine.
Replaced two heads and their drain hoses.
Installed another bilge pump.
Installed a high water alarm.
New stereo.
New scupper drains.
Repaired fiberglass around the port door.
Made all new dock lines.
Installed a new water heater.
Repaired fresh water tank.
Did various plumbing repairs.
And we are just getting started.
|
New holding tank. |
|
Fiberglass work on the flybridge. |
|
Fiberglass work on the flybridge. |
|
Island Queen's main engine. |